1. Slab foundations require special soil preparation, which protects the foundation from moisture and prevents its deformation. This type of foundation bears and scatters the load across the slab plane, so they can be formed where it is complicated to install conventional pile foundations (due to poor soil properties).
  2. The first EPS layer of slab foundations is usually made of EPS 150 or EPS 200. The upper layers are formed of EPS 100, EPS 150 or EPS 200 type polystyrene foam.
  3. The reinforcement frame for load-bearing walls is made.
  4. In order to reinforce the slab foundation, two reinforcement nets across the slab plane are required.
  5. Internal piping networks (water supply, concrete floor heating pipes, sewerage, etc.) installation begins.
  6. The last stage of the formation of slab foundation is concrete casting.

Compared to conventional trench-fill or rostwerk foundations, the installation time of slab foundations is significantly shorter. This type of foundation can be installed in 4-5 days.